Our sawmill in Sebeș

The sawmill in Sebeș, which started production in 2003, was the HS Timber Group’s first sawmill in Romania. Today, it employs around 600 people.

Facts & Figures

Established 2003
Plant size 53 ha
Cutting 1.45 million m³ of logs  *
Planing 580,000 m³ * (raw)
Kiln drying   880,000 m³ *
Laminated products 52,000 m³ * (raw)
Pellets 124,000 t *
Briquettes 30,000 t *
CHP plant** 1 8.6 MW caloric *

2.4 MW electric *
CHP plant 2 27.5 MW caloric *
8.5 MW electric *
Hot water boiler 20 MW *

* Production capacity (2017)        ** Combined heat and power plant

 